Solutions · Facility-agriculture integration
Blueberry Fertigation System Engineering Guide
An engineering guide from water treatment to in-field emitters and handover
IllustrationSummary
Blueberry roots are shallow and sensitive to water quality, EC, pH, and uniformity. The guide breaks the system into procureable packages: sand and disc filtration, reverse osmosis, a buffer tank, a multi-channel doser, UPVC mains, and either tape or pressure-compensating arrows at the plants. Commissioning is not just “water flows”: it includes a pressure hold, a drain-ratio window, and an EC/pH check against the set points. This page does not publish prices. Raw-water quality, plant density, and house layout will change the bill of materials.
IllustrationWhere It Fits
- New or upgraded blueberry houses, tunnels, or substrate parks
- Sites whose raw water needs reverse-osmosis pre-treatment
- Production blocks that need zoned irrigation, data logging, and optional 4G supervision
- Projects that want a written commissioning standard for pressure, drain ratio, and EC/pH
If you only need a sector overview, start with the Integrated Smart Facility Agriculture Solution.
Technical Highlights
Water treatment
- Reverse osmosis illustrated at a 2 T/H capacity
- Sand and disc filters, shown as Φ400 × 1650 mm
- High-pressure pump: a branded unit is shown as the example (brand and model follow project selection and supply)
- Eight 4040 membrane elements; salt rejection stated as 90–98%
- Electrical example components are from well-known brands (final brands follow procurement)
Storage and dosing
- Example tank about 9 T, 1.83 m × 3.41 m, material marked SGC440, 1.0 mm wall, 0.85 mm PVC liner
- Example doser Auto-C5, 4G connectivity, four channels
- Four 500 L fertiliser tanks
- Pump ratings of 2.2 kW and 1.5 kW appear in the proposal
- UV disinfection stated at 480 W
IllustrationIn-field piping (technical items only; no prices)
- Main: De50 UPVC, 50 mm / 1.0 MPa, runs the length of the house
- Tape example: 16 mm tape, 16 × 0.3 mm, 1.5 L/h
- Arrow example: PE black-and-white 20 mm pipe (0.4 MPa); four-outlet pressure-compensating arrows at 3.85–4 L/h, 3 mm barb, 1-to-4, 50 mm laterals
Illustration- Valves: 1.5-inch irrigation solenoid (AC 24 V, female thread); 16 mm union bypass (T-start) for zoned timing
IllustrationCommissioning examples in the guide
- Pressure test: zero drop over 30 minutes
- Drain ratio held between 20% and 30% (worked example 24.5%)
- Nutrient-solution checks illustrated at EC 1.8 / 2.2 and pH 5.5 / 6.0 (acceptance contrasts, not a crop recipe)
IllustrationHow We Deliver
- 01ConsultationSite, scale, purpose and budget
- 02Site SurveyEngineers visit and check conditions
- 03Proposal & QuoteA practical plan and a clear quotation
- 04Build / DevelopDelivered to plan with regular progress updates
- 05CommissioningJoint testing, document handover, training
- 06Operation SupportContinued maintenance after handover
FAQ
Is this only for blueberries?
The guide is written around blueberry water quality and substrate irrigation. The same treatment, dosing, and zoning approach can inform other berry or substrate crops. Recipes must be set separately.
Is reverse osmosis mandatory?
It depends on the raw water. A 2 T/H RO train is the standard example. Pre-treatment can be scaled after a water analysis.
Tape or arrows?
The guide shows both: inline tape and four-outlet pressure-compensating arrows. The choice follows trough design, spacing, and whether you need point-of-root delivery.
Why are prices not listed?
Quotations are set by project scale and move with batch, brand, and water quality. The website publishes ratings only. Ask us if you need a bill of quantities.
What matters at handover?
The guide emphasises a 30-minute pressure hold, a 20–30% drain ratio, and EC/pH against set points.
Can we change recipes remotely?
The example doser supports 4G.
How do we get detailed drawings?
The full proposal materials are being prepared; request them through the contact form (info@bcne.com.cn or +86-22-58695656).
Download
The web version downloads directly. For the high-resolution version, please leave your name, phone and email first — the download starts right after you submit.
Ask About This Solution
Fields marked * are required. We reply within 1 working day.
✔ We reply to every inquiry within 1 working day.
This page introduces a solution and is not an offer. BCNE is not affiliated with Beihang University.