BCNE — Bio-Climate & Nature Engineering · Bright Crops, New Era☎ +86-22-58695656✉ info@bcne.com.cn

Solutions · Farm IoT and software

Digital Blueprint for Smart Greenhouse Systems

Three-surface operations on a private network, with reserved interfaces

  • Version:V1
  • Updated:2026-11-17
Digital Blueprint for Smart Greenhouse Systems(Illustration)Illustration
Digital Blueprint for Smart Greenhouse Systems · Illustration, not a project photo

Summary

The blueprint asks how to run production software in a park that cannot let operational data leave the site. The answer is a digital core plus three surfaces:

  • PC console: plans, inventory, equipment, and full traceability
  • In-house display: climate, equipment state, and public planting facts — view only, no control
  • Tablet: task execution, photo close-out, and authorised equipment control

Access is authenticated on the private network, with alerts for equipment and climate exceptions. Nursery and planting plans generate daily field tasks; work is photographed before and after. Inventory covers inbound recognition, grading, stock, and outbound, and can link to scales and label printers. Assets have unique IDs, patrols, and stock alerts, and manuals can be pushed to a trainee tablet. AI and external logistics are reserved until the conditions in the brief are met.

Rows of leafy vegetables in a greenhouse under a steel frame and ventilation fans, with an electronic display on a column
Inside a facility greenhouse (project site photo)

Where It Fits

  • Facility farms that require a private network and tightly controlled data egress
  • Teams that want a console, a public display, and a field tablet, with a hard split of control rights
  • Projects that will digitise tasks, inventory, and maintenance first, and add AI or external logistics later
  • Owners who need to exchange models and production plans with a client’s industry platform or an existing management system (no owner or sector name)

Technical Highlights

  • Three surfaces: the console holds full data and thresholds; the display is read-only; the tablet starts and stops equipment and closes tasks
  • Private-network sign-in and alerts
  • Interfaces can provide a 3D house model (FBX is the example format) and structured field/base data; real geography and yields are not published here
  • External delivery and multi-party reconciliation are reserved until security standards are met; manual tables are used in this phase
A 3D greenhouse model overlaid with environment data panels such as temperature, humidity and lightIllustration
Greenhouse 3D digital model with environment data (blueprint illustration)
  • Climate exceptions can drive vents, shade, lighting, and irrigation (thresholds set on the console)
  • Nursery tracking includes sowing completion, emergence, and discarded seedlings
  • Task logs combine photos, staff, fertiliser and water use, and climate curves
Ring diagram showing the four modules covered by the management terminal: growth and harvest, seedling management, farm work and fertigation, and planting managementIllustration
Management terminal: growth, seedlings, farm work and fertigation, planting (blueprint illustration)
  • Inventory, linked scales and label printers, and low-stock alerts
  • Asset codes, daily maintenance tasks, issue/retirement records, and training push to tablets
  • AI for stage recognition, health, and early pest cues is described as a future upgrade: this phase reserves the neural-network interface. Sugar sensing and automatic rice/maize stage calls are not described as delivered features on this page.
Illustration of a receiving, grading, dispatch and stock-count line with on-site monitoring and a label printerIllustration
Smart agricultural warehouse and logistics line (blueprint illustration)

How We Deliver

  1. 01ConsultationSite, scale, purpose and budget
  2. 02Site SurveyEngineers visit and check conditions
  3. 03Proposal & QuoteA practical plan and a clear quotation
  4. 04Build / DevelopDelivered to plan with regular progress updates
  5. 05CommissioningJoint testing, document handover, training
  6. 06Operation SupportContinued maintenance after handover

FAQ

Must we run a private network, or is a cloud allowed?

This blueprint is written for a private network. Cloud or hybrid options can be assessed against other briefs if that is acceptable to you.

Can you connect to our group wall or GIS?

A 3D model and structured base data are reserved. Protocols and security reviews are designed per project. The website refers only to a “client’s industry platform,” not to a named owner or sector.

Can the visitor display move equipment?

No. The in-house display is view-only.

Do you already offer ripeness or sugar AI?

Those items are written as later upgrades. Trust a live demonstration and the contract scope.

Are outbound logistics in phase one?

The brief defers external delivery interfaces and currently relies on manual tables.

Is this the same product as Nongpeng Steward?

The functions overlap (three surfaces, tasks, inventory, assistant). This blueprint stresses private-network architecture and external interfaces.

How do we get the full blueprint?

Download the Web PDF, or request the high-resolution file. info@bcne.com.cn, +86-22-58695656.

Download

Download the full illustrated PDFV1 · The web page is the canonical version

The web version downloads directly. For the high-resolution version, please leave your name, phone and email first — the download starts right after you submit.

Ask About This Solution

Fields marked * are required. We reply within 1 working day.

Office11F, Tower D, Haojing International Building, 588 Hongqi South Road, Nankai District, Tianjin, China
Business hoursMon–Fri 9:00–18:00 (China Standard Time, UTC+8)

✔ We reply to every inquiry within 1 working day.

This page introduces a solution and is not an offer. BCNE is not affiliated with Beihang University.