Solutions · Facility-agriculture integration
Integrated Smart Facility Agriculture Solution (Overview)
A shorter tour of the same offer
IllustrationSummary
This overview presents BCNE’s move from communications and intelligent-building work into facility agriculture, as a turnkey path from planning and construction through equipment integration and operations. The two carriers are a cold-climate solar greenhouse and a Venlo multi-span production house.
The tour covers the modified Gothic structure and active heat storage, thermal-bridge control and frost-protected foundations, rolling blankets, pad-and-fan cooling, heat-source options, fertigation and drain recovery, lighting and CO₂, pest exclusion and video, plus hydroponics, vertical strawberries, rolling benches, and mushroom rooms. The digital section covers a BIM / digital-twin cockpit, vision and transpiration models, itemised energy, and lot-level traceability. For the full parameter set, use the full-book page.

Where It Fits
- Owners who need a short briefing before a detailed design
- Parks combining solar houses and Venlo ranges
- New or expanded sites focused on cold-climate operation, energy upgrades, and digital operations

Technical Highlights
- Modified Gothic: 40% better snow shedding and 15% better solar-heat use, as stated
- 150 mm high-density rock wool plus a waterproof thermal blanket
- Prefabricated galvanized frame, no field welds, zinc ≥80 μm, corrosion protection described as 20+ years
- Pad and fan, 5–10°C cooling
- Venlo: glass roof and PC walls; double thermal screens, interior and exterior shade, circulating fans
- Fertigation with automatic EC/pH, pressure-compensating emitters, UV and drain recovery
Illustration- CO₂ at 800–1200 ppm
Illustration- Rolling benches: usable area stated as rising from 60% to 80%
- Vision accuracy of 95% for grey-mould cues, as stated; irrigation with a Penman–Monteith model; deep reinforcement learning on greenhouse thermal inertia, with 15–20% energy saving stated
Heat-pump system COP>2.5.
- The brief uses “military-grade network integration” for reliability: local closed-loop operation in severe weather or if the public network fails. This describes a capability, not a separate government licence.
IllustrationHow We Deliver
- 01ConsultationSite, scale, purpose and budget
- 02Site SurveyEngineers visit and check conditions
- 03Proposal & QuoteA practical plan and a clear quotation
- 04Build / DevelopDelivered to plan with regular progress updates
- 05CommissioningJoint testing, document handover, training
- 06Operation SupportContinued maintenance after handover
FAQ
How is this different from the full book?
Same subject. The full book is 45 pages; this is a 15-page tour. Design work should follow the full book and the formal drawings.
Why does the page title say “Overview”?
The two PDFs share a main title, so the page title adds “Overview” to tell them apart.
Do “phase II” and “phase III” identify a particular farm?
The brief uses stages to show how equipment choices evolved. The website does not name the owner or tie those stages to a recognisable site.
What does “military-grade” mean?
It is not a separate licence. The brief uses it for reliability: the system can keep running locally in severe weather or if the public network fails. We publish that wording together with those concrete capabilities.
How do you choose a heat source?
The overview compares an oil heater and an air-source heat pump, and mentions rooftop PV as an upgrade. Climate, tariff, and capex drive the design.
Is a digital twin mandatory?
It is a platform option. Whether it is in this phase depends on budget and operations.
How do we download both documents?
Both pages offer an open Web PDF and a high-resolution file after a short form. info@bcne.com.cn, +86-22-58695656.
Download
The web version downloads directly. For the high-resolution version, please leave your name, phone and email first — the download starts right after you submit.
Ask About This Solution
Fields marked * are required. We reply within 1 working day.
✔ We reply to every inquiry within 1 working day.
This page introduces a solution and is not an offer. BCNE is not affiliated with Beihang University.